CUSTOMER: SAIPEM
Typology: CONSTRUCTION SUPERVISION
Period: 2014-2016

Busso-Paliano pipeline
Works management for the construction of the Busso-Paliano pipeline (1st and 2nd section). Particularities of the activities: Presence on the track of PIL, PIDI, PIDS, PIDA; Crossing the Biferno River, the Volturno River; TOC, Piling in Micropiles
Other works
Larino-Termoli pipeline
CUSTOMER: ENERGYTypology: ENGINEERING Period: 2009-2011Larino-Termoli pipeline Feasibility study and basic engineering...
Algeria-Sardegna-Italia pipeline project (galsi)
Customer: SAIPEMTypology: ENGINEERING Period: 2010Algeria-Sardegna-Italia pipeline project (galsi) Line detail design...
Detailed design of the Recanati-Foligno pipeline
CUSTOMER: SAIPEMTypology: ENGINEERING Period: 2011Detailed design of the Recanati-Foligno pipeline Line detail design...
Other works
Larino-Termoli pipeline
CUSTOMER: ENERGYTypology: ENGINEERING Period: 2009-2011Larino-Termoli pipeline Feasibility study and basic engineering...
Algeria-Sardegna-Italia pipeline project (galsi)
Customer: SAIPEMTypology: ENGINEERING Period: 2010Algeria-Sardegna-Italia pipeline project (galsi) Line detail design...
Detailed design of the Recanati-Foligno pipeline
CUSTOMER: SAIPEMTypology: ENGINEERING Period: 2011Detailed design of the Recanati-Foligno pipeline Line detail design...

Phone
Lucrezia di Cartoceto
Tel.: +39 0721876031
Social
Send us an email

COMPANY AND VALUES
SERVICES
WORKS
POLICIES
CERTIFICATIONS
FOLLOW US
Registered office: Via Circonvallazione Kennedy, 104 61030 Lucrezia di Cartoceto (PU) |Tax Code and VAT number 02138470410
Ph.:+39 0721 876031 | E-mail: amministrazione@ingeoprogetti.com | Pec: ingeoprogetti@pec.it